Tamil Nadu CM unveils Rs 274.46 crore higher education infrastructure projects
Ruchika Kumari | August 4, 2026 | 09:59 PM IST | 1 min read
Tamil Nadu CM C. Joseph Vijay inaugurated 51 higher education infrastructure projects worth Rs 274.46 crore across colleges and Thiruvalluvar University.
Tamil Nadu Chief Minister C. Joseph Vijay inaugurated higher education infrastructure projects worth Rs 274.46 crore at the Secretariat today (August 4).The projects, developed under the Higher Education Department, comprise classroom blocks, laboratory buildings, workshop buildings, skill development centre workshops, libraries and e-libraries. It also includes artificial intelligence and data science facilities across government polytechnic colleges, arts and science colleges, engineering colleges, and Thiruvalluvar university.
Inaugurated projects
At Government Polytechnic Colleges across the state, including those in Taramani (Chennai), Chengalpattu, Chromepet, Sevvapet, Sankarapuram, Boomandahalli, Palacode, Kelamangalam, Bargur, Uthangarai, Nagappadi, Udhagamandalam, Perundurai, Tiruchirappalli, Srirangam, Mohanur, Gandarvakottai, Aranthangi, Raghunathapuram, Valangaiman, Sivaganga, Karaikudi, Kottur, Andipatti, Madurai, Ambalakkaranpatti, Usilampatti, Nagercoil, Thoothukudi, Ettayapuram, Madhanur, Cuddalore, Virudhachalam, Paramakudi, Coimbatore, Ariyalur, Perambalur, Karur and Tiruppur, classroom buildings, laboratories, workshops, skill development centre workshops, libraries, e-libraries, and artificial intelligence and data science buildings were constructed at a total cost of Rs 226.98 crore.
At government engineering colleges in Salem and Erode, additional classroom buildings, laboratory facilities and library buildings were constructed at a cost of Rs 6.08 crore.
Also read Centre sat on a fifth of Samagra Shiksha funds every year; PM SHRI dues at 49% in 2025-26: Govt data
Government arts and science colleges in Chennai, Chengalpattu, Tiruppur, Sivaganga, Madhanur (Vellore district), Cuddalore, Virudhachalam, Paramakudi (Ramanathapuram district) and Nagercoil (Kanniyakumari district) received new classroom buildings, laboratories and e-library facilities built at a cost of Rs 35.40 crore.
At Thiruvalluvar university in Vellore district, new classroom buildings were constructed for the departments of sociology, environmental science and microbiology at a cost of Rs 6 crore.
Overall, the chief minister inaugurated 51 higher education infrastructure buildings completed at a total cost of Rs 274.46 crore.
The inauguration was attended by minister for rural development and water resources N. Anand, minister for public works and sports development Aadhav Arjuna, minister for higher education P. Viswanathan, chief secretary Dr M. Saikumar, and other dignitaries.
Follow us for the latest education news on colleges and universities, admission, courses, exams, research, education policies, study abroad and more..
To get in touch, write to us at news@careers360.com.
Next Story
]Featured News
]- Karnataka's draft teacher transfer rules propose compulsory 9-year tenures in KPS, other flagship schools
- UGC helpline for reporting sexual harassment defunct from the start but listed on Saksham portal
- CAT 2026: In a first, IIM Indore to use AI-based face recognition along with admit card check at exam centres
- NCAHP Draft: ‘Unqualified’ allied health science professionals need bridge course, exam to keep practising
- Small-town students lack awareness, not merit; institutions must help them with scholarships, admissions
- MANUU BVoc, MVoc: What’s the NCAHP registration row and why are 600 allied health science students protesting?
- AIIMS Delhi, JIPMER, others: 1 in 7 resident doctors at top medical colleges quit midway; UDF urges probe
- Over 2,500 reserved faculty posts vacant across 17 IITs; at 10 institutes, over 60 depts with no SC teacher
- Share teachers before school closure; mergers, student relocation must be last resort: EAC PM paper
- ‘Not a course assignment…’: MS student turns off-syllabus research into Elsevier paper; this is how