Mining ministry invites projects in critical metals, rare earths from universities, HEIs
Divyansh | November 14, 2023 | 04:16 PM IST | 1 min read
Applicants can submit their proposal on the Satyabhama portal, research.mines.gov.in, by December 4.
NEW DELHI: The ministry of mining has invited projects having direct bearing on mineral and mining sector from students, scientists and researchers at academic institutions, universities, and Research and development institutions.
The projects will be accepted for three years by the ministry. The institutes should be recognised by the department of scientific and industrial research. Project proposals are to be submitted online on the Satyabhama portal, research.mines.gov.in, by December 4.
The applicants will also have to send a soft copy of the project proposal generated from the Portal in PDF format needs to be sent to the e-mail: met4- mines@gov.in.
The ministry has invited science projects in the field of critical metals such as gallium, niobium, nickel, lithium, tungsten, germanium, selenium and indium; rare earth; recycling and circular economy; energy efficiency; and new material and processes.
Guidelines for submitting proposals
The ministry of mining said the project proposal should have participation of micro, small and medium enterprise or an industry in the form of at least 20% financial contribution (between cash and kind contribution, at least 15% cash contribution). If a candidates is submitting the proposal in research and development category, then it should be in the technology readiness level (TRL) of 3 to 7 in the identified thrust areas, the ministry added.
Also Read | Research in Indian academic institutions and India's top 1,000 researchers: A white paper
The proposal should have also completed the sample collection and its first level characterisation. The institute should have analysis capability or prior tie-up with other institute in this regard for the intended purpose, the ministry said. In case of a proposal submit by CSIR labs, co-funding from CSIR of at least 25% of the total project cost or total cost of capital equipment, which ever is higher is mandatory.
Follow us for the latest education news on colleges and universities, admission, courses, exams, research, education policies, study abroad and more..
To get in touch, write to us at news@careers360.com.
Next Story
]Featured News
]- West Bengal frames teacher transfer policy; will move staff, posts from over 4,000 zero-enrolment schools
- CJP Protest: Draft amendment to paper-leak law proposes 5-fold increase in fines, 10-year imprisonment
- NEET protest 2026 exposes an education system grooming students for ‘one rat race after another’
- ‘I was raised to raise my voice,’ says Rhiya Ahir who stopped a police van with CJP protesters in Mumbai
- ‘Took first train’: Delhi Police action, not paper leaks, drives hundreds more to CJP protest at Jantar Mantar
- CLAT Exam Reform: 3-section paper; scrap GK, current affairs; outsource but not to NTA, suggests NLU panel
- Over 60% of DU undergraduate students opt out of 4th year of FYUP: Education Ministry
- Pesticide Control to Pilgrimages: Govt teachers routinely burdened with, and punished for, non-academic work
- Private nursing colleges surge in West Bengal but more BSc, GNM, ANM seats lead to more scrutiny
- Over 1,000 KGBVs without functioning ICT labs; over 400 KVs are short of computers: Education ministry data